| Category |
Case Studies |
| Avionics |
Interface Adapter Cooling
The case study emphasizes a feasibility study of a design needed to facilitate 33% increase in power to support new application.
|
| Computing |
Next Generation Graphics Board
A graphics card manufacturer is upgrading their card to support a new generation of video applications.
|
| Consumer |
Power Supply Sizing
The case study emphasizes a feasibility study of a design needed to facilitate 33% increase in power to support new application.
|
| Consumer |
Projector Enhancements
An advertising company has developed a new, interactive system for delivering their content. This system consists of a multimedia projector and a PC, all enclosed in a shroud. Installed in public venues, this new system was found to be shutting down in some sites. Root cause analysis showed the unit was overheating. ECS was asked to evaluate the current design and recommend modifications.
|
| Medical |
Surgical PC Design
The case study emphasizes a PC with an integrated display, for use in surgical applications.
|
| Networking |
Server Enhancements
The case study emphasizes a feasibility study thermal model to determine if the components on the motherboard and daughterboard were properly cooled.
|
| Telecommunications |
Telco Chassis Repackaging
The case study emphasizes a design an air system to improve rack packaging efficiency in a telecommunications company.
|